utility-resource-plan source

OUC 2025 Ten-Year Site Plan

OUC's filed plan describes existing generation, projected load and reserve margins, planned solar and storage, and generation transitions. Its 2025-34 cumulative present-worth cost (CPWC) scenarios discount fuel and energy, non-fuel variable O&M, and startup costs to 2025. The plan evaluated no new capacity additions, so its $2.186 billion base and $2.414 billion high-fuel figures are system production and operating-cost scenarios, not incremental capital costs of a clean-energy transition or acceleration.

Reviewed July 24, 2026

Orlando Utilities Commission, 2025 Ten-Year Site Plan, filed April 1, 2025.

Current

Open at floridapsc.com (opens in new tab)
Read the document notes

What this source supports

OUC's filed plan describes existing generation, projected load and reserve margins, planned solar and storage, and generation transitions. Its 2025-34 cumulative present-worth cost (CPWC) scenarios discount fuel and energy, non-fuel variable O&M, and startup costs to 2025. The plan evaluated no new capacity additions, so its $2.186 billion base and $2.414 billion high-fuel figures are system production and operating-cost scenarios, not incremental capital costs of a clean-energy transition or acceleration.

No additional document notes are published for this source.

Where it appears

Policy checks
4
Policy reviews
0
Public record
0

Topic reviews: Clean Energy & Electrification

Accountability

Prepared by
OrlandoFirst.city
Last reviewed
July 24, 2026